Service phase 3: Design development
Work the concept up into a complete design — with a reliable cost calculation.
Placeholder content: the final texts for this page are still to come. Structure, percentages and the calculator are already final.
Placeholder: In the design development we work the planning concept up step by step into a complete design and prepare the cost calculation. The final text is still to come.
Fee share under the HOAI
- Buildings and interiors
- 15 %
- Structural design
- 15 %
- Technical equipment
- 17 %
Percentages per sec. 34 (3), sec. 51 (1) and sec. 55 (1) HOAI 2021; "—" = the phase is not part of this service profile.